Category Archives: Time-Based

One Day Final Project

Advertisements

Posted in Best Work, Time-Based | Tagged , | Leave a comment

Production Update: Nighttime After

    After finishing the difficult parts, I want the ending to be more simplistic and beautiful, as discussed earlier in my design. These ending parts are more focused on the message that I am trying to convey, being that … Continue reading

Posted in Time-Based | Tagged , | Leave a comment

Production Update: Animation and Silhouettes Part 2

  Along with the daytime shot this shot is one of the more difficult. This one has even more silhouettes then the daytime because it is at night and I feel like nighttime can be very hectic as well depending … Continue reading

Posted in Time-Based | Tagged , | Leave a comment

Production Update: Animation and Silouettes

  This is among the longer and more tedious part of my project. This is because it has the most stuff in it, being the silhouettes. It can be tricky and tedious with the timing however it is part of … Continue reading

Posted in Time-Based | Tagged , | Leave a comment

Gannet Chart Checkin/Presentation

Through some issues over the past few days with my computer I have not been able to resume working on my senior project. However, I am not behind. Currently I am supposed to be working on animating the walk cycle … Continue reading

Posted in Time-Based | Tagged | Leave a comment

Presentation

  Inspirations: -Mc. Echer Cat -James Prosek – Real dogs for sketching and drawing walk -Pictures of city for ideas for foreground and background  

Posted in Time-Based | Leave a comment

Concepts

Research: I looked up a few artists that I thought were interesting and had a fun and unique drawing style. One was James Prosek, who had an interesting drawing style, using the outlines to represent a form. These are always beautiful … Continue reading

Posted in Time-Based | Tagged , | Leave a comment